Saturday, May 18, 2019

Netw410 Week2

Lab Report 1. What be the business goals? (10 points) Business Goals for this projection include addressing the growth of on-campus and online students. To accomplish these goals a centralized server located in new IT extension service of the administration building providing online backup of all data. Replacing the PBX-based telephone clay with a VoIP based placement and connecting all buildings providing high-speed wired mesh topology connection for all facility offices will be employ along with controlled wireless memory access for students.Wireless access for students and general population will be provided outside the building. These step are necessary to build a solid infrastructure for the network and allow for and to plan growth. bread and butter has been established to purchase land 15 miles away and as the campus expands this will be the next commit for expansion.The actual business goals for this project is to offer new and better services and support, open the network to paint constituents, build relationships and information accessibility to a new level, as a basis for the network organisational model, avoid business disruption caused by network security problems, avoid business disruption caused by natural and unnatural disaster, modernize outdated technologies and reduce telecommunications and network costs, including everyplacehead associated with separate networks for voice, data and video. 2.What are the business diffidences? (10 points) The business constraints are like all companies and they include budgets, military unit, policies and schedule. None of which have been defined in our design lab scenario. Budget costs include equipment purchases, software licensing, maintenance agreement and staff training. staff office constraints related to the business constraints to be considered include the availability of existing trained personnel and if existing personnel essential receive additional training to implement and maintain the proposed network changes.Policies of the organization must be considered and since this a community college determination of protocols, standards and vendor selection must be determined. The final business constraint addressed should include the schedule of the implementation as not to interfere with current operation by faculty, staff and students. 3. What are the technical goals? (10 points) Technical goals of the project include improving responsiveness and throughput of the network as many users are added along with additional applications, especially the VoIP based system.Simplifying network management is obtained by alter the server(s) and backup in a newly built IT wing in the administration building. By this centralisation and backup improvement should be obtained to the security and reliability of applications and data along with decreased expected downtime. By offering high speed wired network connections to each faculty office and controlled wireless access for the students modernizing outdated technologies shines as one of the technical goals. With all these proposed improvements scalability of the network is achieved. . What are the technical constraints? (10 points) The current system equipment must coexist with the new equipment and as already discovered there must be increase bandwidth. Existing wiring should either be upgraded to accommodate upgraded speeds. The new or expanded network must not interfere with the current applications. Any new network or expanded network should to a fault ensure IPv6 compatibility. 5. Diagram the existing network. (10 points) The actual Visio drawing is also submitted 6. Describe the existing network traffic. (10 points)Current network traffic is at 73% or more utilization based on a tail fin minute average with sustained spikes to 100% on the Cisco FastHub 400s installed in each building. Approximately 42 students are logged into each wireless access point. This is creating lag times and most assuredly d ropped packets. While dropping packets with data is troublesome it is disastrous for voice or video. According to our text there should be no shared Ethernet segments that are saturated (no more than 40% network utilization. ) The current system is working at 73% utilization. Network traffic must be improved. 7.Complete this table for all of the applications that currently run over the network. (10 points) Application Name Type New or Existing Criticality Comments Google Apps for Education Email / entanglement Site Existing X MS Office productivity Existing X Web browser (IE) Productivity Existing X Catalog / Checkout System / Library Database Existing Administration construct only Data Share Productivity Existing X Terminal Emulation Program (AS400) Productivity Existing X Administration Building only Blackboard Learning Management System (CRM) unused X Internet Connection

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.